厂家对燃气热风炉天然气泄漏怎么办?

2019-08-17 19:42:20 常州亿创能源科技有限公司 阅读

室内燃气管道泄漏:立即紧急关闭,切断热风炉机房主风阀,通知燃气公司并向公司安全生产部门报告,根据天然气泄漏应急预案进行处理。在热风炉的运行中,安全阀每天检测一次。热风炉作为热动力机械,于20世纪70年代末在中国开始广泛应用,它在许多行业已成为电热源和传统蒸汽动力热源的换代产品。通过长时间的生产实践,人们已经认识到,只有利用热风作为介质和载体才能更大地提高热利用率和热工作效果。
Indoor gas pipeline leakage: immediately shut down, cut off the main air valve of the hot stove engine room, notify the gas company and report to the company's safety production department, and deal with the gas leakage emergency plan. During the operation of hot blast stove, the safety valve is tested once a day. As a thermal power machine, hot blast stove began to be widely used in China in the late 1970s. It has become a replacement product of electric heat source and traditional steam power heat source in many industries. Through long-term production practice, it has been recognized that only using hot air as medium and carrier can the thermal efficiency and thermal work effect be greatly improved. 关闭燃气热风炉的天然气主阀,切断气源。
Close the natural gas main valve of the gas hot blast stove and cut off the gas source.
根据天然气泄漏应急预案进行处理。燃油热风炉通过长时间的生产实践,人们已经认识到,只有利用热风作为介质和载体才能更大地提高热利用率和热工作效果。传统电热源和蒸汽热动力在输送过程中往往配置多台循环风机,使之最终还是间接形成热风进行烘干或供暖操作。这种过程显然存在大量浪费能源及造成附属设备过多、工艺过程复杂等诸多缺点。
Processing according to the emergency plan of natural gas leakage. Through a long period of production practice, people have realized that only by using hot air as medium and carrier, can the heat utilization rate and thermal working effect of oil-fired hot blast stove be improved greatly. Traditional electric heat source and steam heat power are often equipped with multiple circulating fans in the process of conveying, which eventually form hot air for drying or heating operation indirectly. Obviously, there are many shortcomings in this process, such as a large amount of waste of energy, excessive accessory equipment, complex process and so on.
3.燃烧器泄漏:立即关炉,切断热风炉的总风阀,并向公司的安全生产部门报告,根据天然气泄漏应急预案进行处理,组织相关技术人员的维修。
3. Burner Leakage: Close the furnace immediately, cut off the main air valve of the hot blast stove, report to the company's safety production department, deal with it according to the emergency plan of natural gas leakage, and organize the maintenance of relevant technical personnel.
4、控制、调节、测量等部件及其接头泄漏。
4. Leakage of control, adjustment and measurement components and their joints.
立即关炉,切断燃气热风炉主风阀,报公司安全生产部门,按天然气泄漏应急预案处理。组织相关技术人员更换控制、调节、测量等部件,重新密封其位置泄漏的接头。
Close the furnace immediately, cut off the main air valve of the gas hot blast stove, report to the safety production department of the company, and deal with the gas leakage emergency plan. Organize relevant technical personnel to replace control, adjustment, measurement and other components, and re-seal the position leakage joint.
如何更安全地使用燃气热风炉
How to use gas hot stove safely?
1。在燃气热风炉的运行中,保护装置和联锁不能停止。需要检查或者维修的,应当经有关主要领导批准。
1. In the operation of gas hot blast stove, the protection device and interlock can not stop. Where inspection or maintenance is required, approval shall be obtained from the principal leaders concerned.
2.在热风炉的运行中,安全阀每天检测一次。热风炉作为热动力机械,于20世纪70年代末在中国开始广泛应用,它在许多行业已成为电热源和传统蒸汽动力热源的换代产品。通过长时间的生产实践,人们已经认识到,只有利用热风作为介质和载体才能更大地提高热利用率和热工作效果。传统电热源和蒸汽热动力在输送过程中往往配置多台循环风机,使之最终还是间接形成热风进行烘干或供暖操作。电磁安全阀的电路测试应每月进行一次。安全阀排气试验后,启动压力、回程压力和阀瓣开启高度应符合规定并记录下来。
2. In the operation of hot blast stove, the safety valve is tested once a day. As a thermal power machine, hot blast stove began to be widely used in China in the late 1970s. It has become a replacement product of electric heat source and traditional steam power heat source in many industries. Through long-term production practice, it has been recognized that only using hot air as medium and carrier can the thermal efficiency and thermal work effect be greatly improved. Traditional electric heat source and steam heat power are often equipped with multiple circulating fans in the process of conveying, which eventually form hot air for drying or heating operation indirectly. The circuit test of solenoid safety valve should be carried out once a month. After exhaust test of safety valve, start-up pressure, return pressure and disc opening height should be in accordance with the regulations and recorded.
3.在燃气热风炉的操作中,应定期进行排放试验。


标签:   热风炉 热风炉厂家 生物质热风炉 燃气热风炉 热风炉价格